Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9090

Re: Canceling a PO for movement type 655 after UD

$
0
0
  1. Create Returns order for material 10000110 for quantity of 1 000Kg - VA01,
  2. Create Billing document  - VF01,
  3. Creating Outbound Delivery with Order Reference on batch GP20121231 - VL01N,
  4. Inspection lot 05 is created and it is on QI,
  5. Record Usage Decision  for Inspection lot 05 - QA11,
  6. UD is made and return quantity is on free,
  7. We saw a mistake and want to cancel Outbound Delivery 8000..,
  8. Reverse Goods Movement for Outbound Delivery 8000... - VL09,
  9. Message pop up - Deficit of BA Stck.in qual.insp 1 000 KG: 10000110 2100 S020 GP20121231 Message no. M7021
  10. For transaction MB1A, MBST and MB11 in standard option there isn’t movement type 656 but through OMJJ I have activated it.
  11. After activating movement type 656 through OMJJ this type I don’t have 656 falling menu but it gives me to work in that transactions. After I have to save changes I have massage “Update control of movement type is incorrect (entry 656 X X).
  12. If I want to use this transaction (MB1A, MBST and MB11 nonQM transaction) to post batch on QI again I have massage - Change the inspection stock of material 10000110 in QM only Message no. QA495
  13. So, I can’t use movement type 656 and I can’t post batch on QI after UD …

Viewing all articles
Browse latest Browse all 9090

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>